top of page

New Addington Branch

  • Admin
  • Sep 1, 2018
  • 1 min read

The New Addington branch operates between Sandilands and New Addinhton

via Addington Village


Trams run every 7-8 mins at off-peak times.


Services are operated by First Tram Operations for TfL.


Stops served on this branch (in order):


ree

ree

ree

ree

ree

ree

ree

ree

 
 

Greater London Photos was set up back in October 2004 to share a small collection of photos.  Over the years, the site gradually expanded to cover more routes, services and branch lines.

 

2024 the site was expanded further and transferred to a new webhost.  The site was redesigned and turned into a blog style to make it easier for visitors to navigate. 

 

All photos are subject to copyright, please gain permission from the webmaster if you would like to use them elsewhere.

© Greater London Photos 2025

bottom of page